Oil & Gas Supply Chain

LNG export terminal at night: cryogenic storage tanks and insulated pipework lit against dark water, vapour drifting

U.S. LNG Is Absorbing Qatar’s Lost Volumes and Pulling Gas Drilling With It

The single most consequential fact in the global gas market right now is a repair timeline. An attack on Qatar’s Ras Laffan export facility on March 18 damaged two liquefaction trains and knocked out 17 percent of the country’s LNG export capacity. QatarEnergy estimates the repairs could take up to five years. Combined with the […]

U.S. LNG Is Absorbing Qatar’s Lost Volumes and Pulling Gas Drilling With It Read More »

Precision-machined oilfield components, couplings and valve bodies, crated and banded for shipment on a machine shop...

Oilfield Equipment Lead Times Are Stretching as Tariff Rules Rewrite the Sourcing Math

Operators across Texas and the Gulf Coast are running into a problem that had largely vanished from procurement conversations since 2022: the part does not show up on time. The Federal Reserve Bank of Dallas Energy Survey for the second quarter of 2026 put a number on it. The supplier delivery time index jumped from

Oilfield Equipment Lead Times Are Stretching as Tariff Rules Rewrite the Sourcing Math Read More »